Answer / pravin mandgaonkar
Backflush is the automatic process in which system perform
the auto Goods receipt/Good Issues resulting into saving in
the manual interference and therebye cost.We activate it in
Operation overview,Workcenter and Material master.But
setting in the material master has high priority.
Is This Answer Correct ? | 20 Yes | 5 No |
Answer / amit
Back flushing is nothing but automatic goods issue at the
time of confirmation. System automatically posts the goods
issue when you confirm the operations,thus saving the
manual efforts.
Eg. When a 4 wheeler automobile is rolled out from assy
line, 4 wheels & Tyres are deemed to be consumed and issued
to production order automatically by way of backflushing by
the system.
Backflush is used for material which are a must and having
fixed relationship.
This can be configured in MRP2 Screen,Work centre, Routing
and production order,the highest priority being the
material,though each has some special function.
Is This Answer Correct ? | 15 Yes | 8 No |
Answer / sanjay verma
Through activate backflush automatically goods issue
operation to process order. You no need to do transation
mb1b/261. You can activate backflush in material mater-MRP2
view or directly in process order.
Is This Answer Correct ? | 9 Yes | 7 No |
Answer / arun k
Advantage - it reduces the manual effort and time ...
Is This Answer Correct ? | 0 Yes | 1 No |
Define mrp list
Explain Availability check.
Which BOM item category you have used?
How do you get the system to update this value from the routing?
What are dynamic actions? Give a few examples. What are it’s you used in them?
Explain how to create prt master records?
What is mean by Standard Value, Scheduling Margin Key, Production Version, Product Cost Collector, Control Key,Demand Management.
When will the order fully settlement?
What is phantom item & sub contracting
Difference between plan cost, Actual cost and target cost.
Standard mrp steps
If MRP type PD/ND in material master how will work flow.?