what are all the different manufacturing scenarios in pp?
Answer Posted / kartik
There are three scenarios in PP
1.Discreate Manufacturing
2.Repetative Manufacturing
3.Process Manufacturing
Is This Answer Correct ? | 44 Yes | 5 No |
Post New Answer View All Answers
Mention what is the t-code for changing production order and to display production order?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
what are the settings needed for variant configuration?
What is the use of stock requirement list?
In lsmw which is the most important step?
Mention what is the purpose of using capacity planning?
What is the use of t-code cs20 in bom?
What is qualification deficiency?
How many levels of Flexible Planning are there?
Mention how mrp (material requirement planning) types are classified?
Special Procurement type 40 – proc. form alt. plant
Explain schedule margin key
How to attach a drawing for a material to bom ? Is it possible ?
Explain how the pp module is organized in sap?
What is pi sheet