what are all the different manufacturing scenarios in pp?
Answer Posted /
1.Discreate Manufacturing
2.Repetative Manufacturing
3.Process Manufacturing
| Is This Answer Correct ? | 7 Yes | 4 No |
Post New Answer View All Answers
What is the need of mrp list if the stock requirement list is already given?
Can we have more than 6 standard values in standard value key?
How you get the ticket?
IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME
What is primary cost and secondary cost?
Integration between PP and MM Module.
How are time management and payroll are integrated?
Overlapping and splitting, where do you assign?
Explain transaction code KO88 or CO88.
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
Integration between PP and PM module.
What is Individual and collective requirements and differecne between them in MTO scenario?
What are the types of master views for production and planning?
Explain Planning file entry.
How can I use variable size items?