what are all the different manufacturing scenarios in pp?
Answer Posted / sathya
Generally there are three types of manufacturing Scenorios
will discussed in sap pp i.e
1.Discreate Manufacturing
2.Repetative Manufacturing
3.Process Manufacturing
In the above three types we have different scenorios that
is:
a)Make to stock
b)Make to order
c)External processing (Subcontracting)
d)Rework processing
e)Prodcution in another plant etc..
| Is This Answer Correct ? | 11 Yes | 2 No |
Post New Answer View All Answers
list the important tables used in pp.
Difference between Manual reorder point and Automatic reorder point.
How did you configure the payscale structure?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
We want to report on several status combinations like each order that has the status ‘not deleted’ and ‘not technically completed’. What set up is required?
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
What is costing? How it is affected the pp?
In project the customization is comes under which phase?
Explain why there is need of production version?
What is the need of mrp list if the stock requirement list is already given?
What do we do in the realization phase?
what is alternative item group
Explain variant configuration
Mention what is the production process in sap?
What is MRP group?