wat is the optimum mix design for M25 grade of concrete ?
is the ratio 1:1.5:3.65 correct?
Answers were Sorted based on User's Feedback
No the ratio 1:1.5:3.65 is incorrect. The optimum mix
design for M25 grade concrete is 1:1:2
| Is This Answer Correct ? | 77 Yes | 16 No |
Answer / sjtbehera
If you are going Is 456-2000 it is 1:1:2. in case you going
to mix design yes is 1:1.5:3.65. i calculate this design
according to local material.
You also cam calculate.
GRADE OF CONCRETE M 25
TYPE OF CONCRETE: RCC
MAXIMUM SIZE OF AGGREGATE, mm 20
CONCRETE CONFIRMS TO: IS456
SLUMP OF CONCRETE, mm 50-80
CONCRETE MIX FOR : MANUAL PLACEMENT
TYPE OF EXPOSURE MILD
Data on Ingredients
Ingredients Type Source
Average Specific Gravity Water Absorption
Percentage
Cement OPC 53 Coramandal king 3.15
Coarse Aggregate 20mm
2.65 0.81 33
10mm 0.81
22
NA
Fine Aggreagte Crushed Sand
2.630 2.10 32
River sand
2.600 1.00 14
Mineral Admixture 1 NA
2 NA
Chemical Admixture 1 Rehobuild sp1i MBT
1.20 0.70
Target Strength ( fck +1.65 x s )
31.60 N/mm2
Materials required per cum of concrete
Water content 167
Litres
Air content 2.00
%
Free water binder ratio
0.42
Total binder content
400 Kg
Cement content OPC 53 400
Kg
Mineral Admixture 1 NA
Kg
Mineral Admixture 2 NA
Kg
Total Aggregate
1821 Kg
Dry coarse aggregate 1 20mm
601 Kg
Dry coarse aggregate 2 10mm
401 Kg
Dry coarse aggregate 3 NA
Kg
Dry fine aggregate 1 Crushed Sand
583 Kg
Dry fine aggregate 2 River sand
255 Kg
Admixture Rehobuild sp1i
2.8 Litres
Water for absorption
23 Litres
Total water 190
Litres
Total Density of Fresh concrete
2411 Kg/cum
MIX PROPORTION BY WEIGHT
CEMENT FINE AGGREGATE COARSE
AGGREGATE
1.0 2.09 2.50
TOTAL W / B RATIO 0.47
AGGREGATE CEMENT RATIO 4.60
| Is This Answer Correct ? | 19 Yes | 4 No |
Answer / mahendra mohan srivastava
My last answer has a typing error here M25 will 1:1:2.
| Is This Answer Correct ? | 17 Yes | 2 No |
Answer / er shalu verma
OPTIMUM MIX DESIGN FOR M25- 1:1:2
SO 1:1.5:3.65 IS INCORRECT RATIO OF M25 MIX DESIGN.
| Is This Answer Correct ? | 6 Yes | 1 No |
Answer / mahendra mohan srivastava
We have two type of mix one is nominal mix and second is
designe mis. if we go through nominal mix then we can say
M25 is 1:1.5:3. but M25 and above this please go through
only designe mix recommended by BIS. so we can calculate
after seive analyse and thro grading of aggregate.
| Is This Answer Correct ? | 9 Yes | 14 No |
Answer / lalit lokhande
When you go through the mix design ..it almost comes like
1:2.06:3.53,
1:1.5:3.65 is almost correct except the quantity of sand.
| Is This Answer Correct ? | 1 Yes | 9 No |
How much do you want salary?
What is the strength of normal brick in india
how do you stabilize a waterlogged area in road construction
how can calculate cutting length of diamond ring
What is tha cross secional area of cover block
What do you understand by “preset” during the installation process of bridge bearings?
how we decide the thickness of slab
how much lap we should provide in columns for Fe-500?
insted of bentonite we can use any alternate material in piling ?
How many nos. are Contains fly ash Brick in one Cubic meter ?
What is the withdrawal force of steel nails?
what is the relation between pitch of steel and depth of slab?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)