Answer / sjtbehera
1. allingment
2. plumb
3. properly fixed
5. type of joints
6. fixing of masala in joints
| Is This Answer Correct ? | 13 Yes | 2 No |
Answer / nitin ghamdayan
plaster margin both side ,line and level
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / tarun vashist
to check the door n
window is in soul.
to check hole pass is
fixed proper .n plaster
margin also take.
| Is This Answer Correct ? | 1 Yes | 0 No |
how to calculate water proofing area and what is the easy process. explain
why don't we need shear reinforcement in slabs?
in one SQM plaster how much Cement and sand consumed in ratio 1:4
Where is lap in top & bottom beam
suppose we have a tendency to make a hole on the surface of the beam, than where we goes to make it?
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
can i place column steel lapping in floor beam? my lapping is 24 inches in floor beam and 24 inches on floor beam
how much extra rod length should be provided for beam
clean earthing and dirty earthing
1 Answers CSCEC-China State Construction Engineering Corporation,
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
How much is anchor length ?
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)