How to calculate concrete,s cement, sand, metal on the
bases of its ratio. For any volume of work please give me
brief calculation
Answer Posted / raghuram
if 1:2:4 is the ratio the cement require = (1/(4+2+1))x 1440
9density of cememnt)
sand required = (2/(4+2+1))x density of sand
similarly for agg
| Is This Answer Correct ? | 16 Yes | 8 No |
Post New Answer View All Answers
i need gate exam civil engineering question papers with answers
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
What is Rankine Cycle?
What is missing report and how to prepare
What are the different types of civil engineering?
What is need for setting limits?
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
how much cost of single coat 20mm thick plastering per sqre meter
any book or article on pumped concrete.
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
Tell me about triple point of water.
What is difference between combin footing & rapt footing
What is the meaning of a blue land surveyors flag?
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?