Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) How to calculate the quantity of steam lost due to pinhole leak in a steam line of known pressure and line size?
CPCL,
1 7773how caculate the pump head to maintain perticuler pressure of water and what would be the motor size in hp for the same?
1 4102what should be the megger test report for 11KV cable when meggered with 5KV megger , what is the resistance value we should get
7 16980
What is the meaning of less pumping in AC
What type of cross-section is usually of a chisel?
power line carrier communication interview quetion
Which technology is better for designing an STP system in a Commercial Mall. 1) SAFF (Submerged Aerobic Fixed Film) or 2) FAB (Fludized Aerobic Biological ) or 3) Some other.
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
can i connect the two phases of scott connected transformer,if not why?
What is meant by thermal stabilization?
What is pre-stressed concrete?
What is referred to the electron in the outer orbit?
Explain the difference between grey iron and white iron. What is mottled iron ?
whats the Formula to calculate temperature of steam at given pressure
what is designing step of heat exchanger
Tell me about a time when you had too many things to do and you were required to prioritize your tasks
Explain some properties of manganese steel?
are there rmu for 3 transformer?