Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) HOW THE OLTC TRANSFORMER SAVE ENERGY IN COMPARISON TO OFF LINE TRANSFORMER AND IS IT ECONOMICAL TO REPLACE THE OFF LINE TRANSFORMER TO OLTC TRANSFORMER
2200how much anti termite treatment( ATT) liter used in one sq mtr floar area? & what is ratio of ATT & water.
3 26987Re: how to calculate diesel consumption of a D.G.Set? Answer # 1 We can not calculate the diesel comsumption...depending upon load it will conume the diesel...suppose the 1500kva D.G is running and the load is 1000kw means it will consume 150-200 liters per hour....
6 145311. Centrifugal pump is used to drain the coolant from the machine to coolant tank via magnetic separator and paper filter. But more foam is raising in the coolant tank. We need to arrest the foam formation inside tank which is nt desired. How do we correct this issue? (Hardness of the water is at recommended ppm).
2 5154
How many types of losses occur in a transformer?
Explain how do I interpret visible satellite pictures?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
What is meant by pwm control?
A cantilever beam carrying uniformly distributed load will be ?
Explain the different methods used in the choice of rotor slots for reduction of harmonic torques in an induction motor.
Mention the materials used for making care labels.
what is a speed of rotor when we give supply to stator of 50hz and as well as rotor of 60hz of an induction motor?????
Explain the difference between fixed-bias circuit & self-bias circuit?
how oltc works in rectiformers of higher rating (27 mva,200v dc,120kamps) please provide me full information with diaggram.
Hello Friends I had my ONGC test today,but it was very bad.But I would give certain suggestions so that u may not face he problem which i had. Be thorough with Electrical Technology.Generators.motors stators etc.There are 5 questions on that. There were also good no.of questions from Hydraulic machine and Production technology. Then 3 from Strength of materials.And remember the dimensional quantities.
Tell me what is applique?
Why strting torqe high in inducation motor?
What technology is used in latest generators?
Tell me the different types of sensors.