Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
2402How to find the volume of wood(tree) from its height and circumference.(circumference-6'5" and height 3'2")??
1 4485Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
20021 > HOW TO MEASURE INTERFACE LEVEL 2 > DIFFERENCE BETWEEN RADAR & ULTRASONIC LEVEL TRANSMITTER
3 7505What happen when the AVR of the generator fails? Will it cause power instability and total failure of the alternator?
8 38843
Explain the difference between mill and mill-drill?
STATE WORKING OF VACCUM CIRCUIT BRAKER?
Regarding , there is an air cooler which control the fans(50% of AV FANS) by temperature in outlet , and the louver of Air cooler is controlled by HIC from control system , So if on Air cooler we will consider 2 individual I/P converter or positioner?
Is RTCC panel needs any control supply.
Which is better cad/cam in mechanical or computer networking oriented jobs like linux administration or something else like php programming which is demand of today?
Derive the expressions for average output voltage and rms output voltage of 1φ semi converter?
We have two APFC panels in same station. I need how to connect CT in two APFC panels.can we take one CT in series connection or two separate CTs.
please can any one send me BHEL ECE sample papers
Name the equipments required for 2+2+2.
what is the grounding Calculation formula? spouse i want to provide grounding to 3phase 18kw motor or i want to provide ground to 3phase 10kva dry type transformere or you give me any exemple...... Thanks.
3. Differentiate between ultrasonic flowmeter and radar type flow meter.
By which force the missile being fired from airhant?
What is meant by positive converter group in a cyclo-converter?
residential buildings,mixing of concrete,structural,construction material,site handling.
Why Neutral Isolation is required?