Entry Criteria:
1) Business Requirement is at least 80% complete and has been approve to date.
2) Technical design has been finalized and approved.
3) Development environment has been established and is stable.
4) Code development for the module is complete.
Exit Criteria:
1) Code has version control in place.
2) No known major or critical defects prevents any modules from moving to system Testing.
3) A testing transition meeting has be held and the developers signed off.
4) Project manager approval has been received.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sridhar
Entry criteria:
Making the application ready for the testing being continued
by settign all the necessary system propeties, required
operating systems, necessary hardware configurations etc...
also checking for the necessary docs which need for the
application test.
Exit Criteria:
1. To check whether the docs made for the application are up
to date.
2. To check whether the application is perfomrming as
intended to, satisfying the requirements spec.
3. To check whether the testing has been completed on the
aplication with 0 bugs or above 95% accuracy.
| Is This Answer Correct ? | 2 Yes | 2 No |
Mention some of the types of software testing?
What is the rule of a "test driven development"?
What do you think is the perfect test management system for test service vendors like me?
What are the Qualities of a Tester?
what is the difference between lifecycle model and v-model
what are the feature of our test group?
can any one tell me about ieee standrad testcase formats plzzzz
what is software quality assurance?
Who in the company is responsible for Quality?
What is the diff b/w Quality Assurence and Quality Control ?..
11 Answers FIC, Visualize Technology,
I test change password field for a application.But it accept new password same as old password. Is it not a issue??I raise this issue but developer team mark invalid.
disadvantages of V-Model in Software Testing?