what is entry and exit criteria?
Answers were Sorted based on User's Feedback
Entry Criteria:
1) Business Requirement is at least 80% complete and has been approve to date.
2) Technical design has been finalized and approved.
3) Development environment has been established and is stable.
4) Code development for the module is complete.
Exit Criteria:
1) Code has version control in place.
2) No known major or critical defects prevents any modules from moving to system Testing.
3) A testing transition meeting has be held and the developers signed off.
4) Project manager approval has been received.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sridhar
Entry criteria:
Making the application ready for the testing being continued
by settign all the necessary system propeties, required
operating systems, necessary hardware configurations etc...
also checking for the necessary docs which need for the
application test.
Exit Criteria:
1. To check whether the docs made for the application are up
to date.
2. To check whether the application is perfomrming as
intended to, satisfying the requirements spec.
3. To check whether the testing has been completed on the
aplication with 0 bugs or above 95% accuracy.
| Is This Answer Correct ? | 2 Yes | 2 No |
Requirement Analysis – Rs1000, Code Review – Rs500, Review of User Documents – Rs600, Continuing Education Programs – Rs800, Design – Rs400, Then what is the Cost of Quality?
What are the common problems with software automation?
Mention the different types of software testing?
list potential risks that you have identified so far in Banking domain
Anything you know about host file
can you explain the software testing life cycle?
What is the role of QA in a company that produces software?
What is User Acceptance testing?
Q. How do you select product components for validation?What are the contents of QMS?
What is CMM and CMMI? What is the difference?
What is basis set?
why do not u try to get job in your core side(example :-eee)?