what is entry and exit criteria?
Answers were Sorted based on User's Feedback
Entry Criteria:
1) Business Requirement is at least 80% complete and has been approve to date.
2) Technical design has been finalized and approved.
3) Development environment has been established and is stable.
4) Code development for the module is complete.
Exit Criteria:
1) Code has version control in place.
2) No known major or critical defects prevents any modules from moving to system Testing.
3) A testing transition meeting has be held and the developers signed off.
4) Project manager approval has been received.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sridhar
Entry criteria:
Making the application ready for the testing being continued
by settign all the necessary system propeties, required
operating systems, necessary hardware configurations etc...
also checking for the necessary docs which need for the
application test.
Exit Criteria:
1. To check whether the docs made for the application are up
to date.
2. To check whether the application is perfomrming as
intended to, satisfying the requirements spec.
3. To check whether the testing has been completed on the
aplication with 0 bugs or above 95% accuracy.
| Is This Answer Correct ? | 2 Yes | 2 No |
create a daily status report or list the items you will cover in a status report
How can you describe QA process in your last company?
Explain functions of quality assurance department.
0 Answers Mahatma Gandhi University,
who is entry level QA analyst,Sr.QA Engineer,System test analyst and QA director
What is the Difference between 2-tier and 3 tier applications... Anybody can explain in detail... Thanks in advance
During the test case review, what are the main important things will you check
what is test condition
disadvantages of V-Model in Software Testing?
What do you like least about Quality Assurance/Testing?
What is cast?
What are SCORM Standards?
Explain what is the difference between regression testing and retesting?