how does you execute the test cases in Testdirector?
Answers were Sorted based on User's Feedback
Answer / satyanj
Test Lab -> Select Tests -> 'Run' -> 'Exec Steps'.
Execute the steps manually and assign the status as 'Pass'
or 'Fail'.
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / uday
Using QC, we can check end-to-end functionality can be
tested using Test Set in Test Lab module.
In a Test Set, we can include all the tests which verifies
the ene-to-end functionality. Once associated, we can place
them in order and we can execute the whole test set or
individual tests.
For automated tests we can also configure the remote server
where QTP is installed, and execute the test set.
For automated tests in test plan module, open the test in
qtp and click the run button in QTP, which executes the test.
| Is This Answer Correct ? | 0 Yes | 0 No |
What r the tabs in test director?
5 Answers Brainhunter, Satyam,
What is the Change management ?
How can we connect test director to winrunner and database?
Hi all, I use the Requirements Traceability and wnat to send by email a Trace Comment. But when I send out the requirement by mail I don’t receive Trace Comment. In place of Trace Comment I do receive the other felts who I didn’t needed For ex. ReqName, ID, Reviewed, Status, Author, Creation Date, Creation Time, Modified But I would rather be with. ReqName, ID, Trace Comment, RFC_status, Priority, Assigned To, Author, Creation Date Above all, I would like to Trace Comments will. Do you have any idea how to change this? And how to recieve Trace Comment?
How can we connect defect report from testlab&testplan tabs?
How do we attach excel sheet with test director?
what was the advantage of Quality center? functions performed using Quality center? thanks in advance
How do you ensure that there are no duplication of bugs in Test Director?
when i am trying to install QC 9.2 i got a message like"Windows Xp Service Pack2 does not support QC enterprise edition.."what does it mean by.please help me.
can anyone provide the reading material for it it would be very helpful thankx in advance my id is svit00ef27@yahoo.com
what are diadvantages of Test director?.
can we connect qtp 8.2 version with test director 8.0 verion if how if not why 2)when test director 8.0 version released