how does you execute the test cases in Testdirector?

Answer Posted / satyanj

Test Lab -> Select Tests -> 'Run' -> 'Exec Steps'.
Execute the steps manually and assign the status as 'Pass'
or 'Fail'.

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How do you analyze your test results? What metrics do you try to provide?

2890


Explain about "Defect life cycle" in HP Quality Center ?

1775


What are the various types of reports in testdirector?

536


What r the mandatory fields in TD?

1944


how will you do execution workflow, creat and modify test sets

1743






What is the use of test lab in test director?

570


What is the difference between master test plan and test plan?

642


how can we see all fields in test director

1862


how many ways are there to copy test cases in test director

2125


Disavantages of document generator? How to take a print out of the steps in the Parameterized scripts?

2046


How to use testdirector in real time projects?

636


how do u call data file and gui file in testdirector

1779


Hi All, Im currently getting to grips with the Document Generator in Test Director and have a query. We use TD to link requirements to test cases and I am attempting to produce a report which lists the requirement and the test case it is linked to. I cant see a way to do this as the test case link info resides on the Coverage page and it appears the only field available to display for requirements reports within document generator as those on the 'details' tab. Any tips?

1668


how can we see all fields in test director

1556


How can we split the tests in Test Director?

2160