how to use quality center in real time project?
Answer / prasant.maddali
After completing the test cases, we do:
1.Export the test cases into qc.
2.The test cases will be loaded in the test plan module.
3.when execution is started,we move the testcases from test plan tab to the test lab module.
4.In test lab, we execute the testcases mark as pass or fail or incomplete.We generate the graph in the test lab for daily report and send to specific user.
5.If we get any defects and raise the defects in the defect module. When raising the defects , also attach the defects with the screen shot.
| Is This Answer Correct ? | 2 Yes | 1 No |
How to switch between two projects?
What is the Extra tab in QC ? (TCS)
how will you do execution workflow, creat and modify test sets
what are diadvantages of Test director?.
In the defect life cycle, if you find a defect in QC and think that it is not a valid defect. what will you do? just close it or store it in any document for future review, if yes what type of document and where?
How do we attach excel sheet with test director?
What r the views in testdirector?
yesterday night u r giving some scripts to run and u r going to home again today morning u r come to office then how u r check the result in Test Director (TD)?
how to map requirements with testcases in testdirector?
Can you retrieve a test case once you have deleted them in test director?
how many ways are there to copy test cases in test director
Hi All, Im currently getting to grips with the Document Generator in Test Director and have a query. We use TD to link requirements to test cases and I am attempting to produce a report which lists the requirement and the test case it is linked to. I cant see a way to do this as the test case link info resides on the Coverage page and it appears the only field available to display for requirements reports within document generator as those on the 'details' tab. Any tips?