how to use quality center in real time project?
Answer / prasant.maddali
After completing the test cases, we do:
1.Export the test cases into qc.
2.The test cases will be loaded in the test plan module.
3.when execution is started,we move the testcases from test plan tab to the test lab module.
4.In test lab, we execute the testcases mark as pass or fail or incomplete.We generate the graph in the test lab for daily report and send to specific user.
5.If we get any defects and raise the defects in the defect module. When raising the defects , also attach the defects with the screen shot.
| Is This Answer Correct ? | 2 Yes | 1 No |
how to write test cases if we have, given requirement and teplate.
what is connection between test plan tab and test lab tab? how can u access your test cases in test lab tab?
How to map testcases with requirements in test lab?
In the defect life cycle, if you find a defect in QC and think that it is not a valid defect. what will you do? just close it or store it in any document for future review, if yes what type of document and where?
What is Test Builder?(Suma)
can anyone provide the reading material for it it would be very helpful thankx in advance my id is svit00ef27@yahoo.com
can we connect qtp 8.2 version with test director 8.0 verion if how if not why 2)when test director 8.0 version released
What is the use of test lab in test director?
can test cases we wroitten directly on td. wat else we can do in td
How Many Types tab in Testdirector and explain it
What is the main purpose to storing requirement in TD?
How to identify test cases with no scheduled test runs.