A 7 storey building has a floor area of 35,000sq.ft on each
storey. On the ground floor 11KV electrical sub-station is
to be erected. A load of 3kw for every 400sq.ft (p.f is
0.8) is proposed for each floor. fire pump 7.5hp, water
pump 5hp, lift 2 nos, each 10hp and 20shop load of each
shop is 5kw. calculate
a. load each floor
b. total load of building
c. L.T feeders for aech floor and from transformer to
main.
d. distribution diagram
e. capacity of sub-station/capacitor bank
f. line diagram
No Answer is Posted For this Question
Be the First to Post Answer
what are the main parts of UPS what is the function of that?
23 Answers Apollo, HCL, Liebert, Royal Furnishers, Tech Mahindra,
2. What are the parameters of EHT sub-station?
1 Answers APGenco, Blue Star, Enercon,
In Plumbing services What are accessories we consider for a bathroom?
How can CALCULAT the current carrying capacity of aluminum and cOpper cables respective of that Sq.mm ? with formulas ?
12 Answers Bajaj, Eagle, Godawari Power and Ispat, Havells, L&T, Mascot, Polycab, SGML, Sterling Wilson,
i m electrical diploma holder i want to do plc $ Scada some body tell me which insitute is best for me near chandigarh
Hi,I am working in abroad for more than 3 years in a company operating with 11kv and 6.4 MW power. I need c licence in India,can I? some other says only i can get if i work for 2 years in india only! anybody kindly clarify by doubt.Thanks
How to calculate impedance volt in Transformer?
what is the diff.between neutral and earth?
how to calculate regulation constants for over head lines? and what are the regulation constant for raccoon conductor at different voltage level and different P.F?
plz explain the auot-reclosing circuit in electrical engineeing
whay we used silica gel in Transformer
What percentage netural current is in netural depend upon the phase current