my qualification is b.tech- industrial biotech. i was read
about many chemical engineering subject as a allied like
unit operation, chemical thermodynamics, chemical reaction
engineering , mass transfer and separation, downstream
processing and principle of chemical engineering. and i
have 2 yrs working exprience on in the field of
instrumentation and control... and my query is "can i able
work as process technologist" and which subject i want
conc. more?........
No Answer is Posted For this Question
Be the First to Post Answer
Explain some good strategies for curing tube vibration in shell and tube exchangers?
What is carbon sequestration?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.34 : A biochemical engineering company has stock P = 20,000 shares of M % preferred stock of Q = $100 par and N number of shares of $20 par common stock. In year 1 : $10,000 is distributed as dividend. In year 2 : $25,000 is distributed as dividend. Let (Total Dividend) = (Dividend for Preferred Stock) + (Dividend for Common Stock). (a) In year 1, calculate the amount distributed as dividend for preferred stock, when no dividend was distributed for common stock. (b) In year 2, the amount distributed for common stock was $5000. Find the values of M and N, when the dividend per share for common stock is $0.05.
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.26 : In a construction accounting for a biochemical processing plant, $A has been spent to date, and another $B is expected required to complete the construction project. The biochemical processing plant is expected to generate a total revenue of $C. Calculate the : (a) estimated total costs; (b) percentage completion of project; (c) total estimated profit; (d) profit to date.
ENVIRONMENTAL ENGINEERING - QUESTION 22.1 : In order to predict the wastewater production, the population number has to be understood. The population data is : 72000 (for year 1961 or P-1961), 85000 (for year 1971 or P-1971), 110500 (for year 1981 or P-1981). (a) Find the average population increase, or [ (P-1981 - P-1971) + (P-1971 - P-1961) ] / 2. (b) Find the average percentage population increase, or [ (P-1981 - P-1971) / P-1971 + (P-1971 - P-1961) / P-1961 ] / (2) X 100. (c) Find the incremental increase or P-1981 - 2 (P-1971) + P-1961. (d) Let Po = P-1981. After 2 decades or n = 2, the population is P-2001. By using arithmetical increase method, find P-2001 = Po + n (Answer for a). (e) By using incremental increase method, find P-2001 = (Answer of d) + n (n + 1) (Answer of c) / 2. (f) By using geometrical increase method, find P-2001 = Po [ 1 + (Answer of b) / 100 ] ^ n where ^ is power sign, or 1 ^ 2 = 1 x 1 = 1. (g) If the actual P-2001 = 184000, which method of estimation is more accurate, based on your answer in (d), (e) and (f)?
BIOCHEMICAL ENGINEERING INSTRUMENTATION - EXAMPLE 29.4 : The resolution of separation, Rs for chromatography is given by the formula Rs = (difference in retention time) / (average width at the base). In a chromatogram, 3 peaks a, b and c are found. Average widths W at the bases of the solutes are : Wa = 20 s, Wb = 40 s, Wc = 30 s. Resolutions of separation, Rs for solutes b and c in comparison to a are 2 and 4 respectively. The differences in retention times T for b and c in comparison to a are (Tb - Ta) and (Tc - Ta), Ta = Tc - Tb : (a) Form 2 equations involving Rs as a function of Wa, Wb, Wc, Ta, Tb and Tc. (b) Find the values of Ta, Tb and Tc.
What is a common source of error in determining the percent spent caustic in refinery applications?
I want to need previous placement questions of Jindal
1 Answers Jindal, Jindal Steel and Power,
What is screen analysis?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.7 : An engineering investor purchases a $1000 bond that matures in 25 years. The coupon rate is 8 %. The purchase price is at 95 or 95 % of the par bond value. (a) What is the purchase price of the bond? (b) How much discount is enjoyed by the investor on average each year? (c) Find the income generated from coupon rate each year. (d) Find the overall interet rate or Yield to Maturity (YTM) by using the formula : YTM = [ Answer in (c) + Answer in (b) ] x 200 / [ par bond value + Answer in (a) ].
Is there a rule of thumb to estimate the footprint of a cooling tower during design phase?
plz somebody send me the latest placement papers of hpcl graduate trainee post.....at bikash.mallick1@gmail.com
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)