Is v-model cost effective when compared with all other
models? If not which model is cost effective(low cost)?
Answer / aman
Yes, V Model is Cost Effective when we compared to other
Model.Because in V Model from the requirement phase itself
we do testing.Errors found in requirement phase is less
cost when errors compared to other phases. So V Model is
Cost Effective.
| Is This Answer Correct ? | 33 Yes | 2 No |
What are the queries mostly asked in testing ? give me some examples.
if u login sucessusfully in page and reach the 2nd mailing page where u find u are getting only few mails not all then wat would u say test is pass or fail
what is difference b/w test case and test scenario?
Can v prepare Test cases only from BRS from Tester point of view?
What are all covers for the Unit Testing ?
On what security parameters do u test a "web-based application" ..?
What is Six Sigma for Testing?
Hi, can any tell how a tester can be judged? i have to interview a tester, how should i judge whether he has a justified experience or not? how a person with 3 years of experience in manual testing can be judge?
u posted a bug with screenshots and steps to reproduce but still the developer is not accepting this is a bug. in dev system it is not reporducing . how u'll convince he developer? (if the developer is in india or onsite(give the answer for both the cases)
1)how the oppurtunities will be for a QA(manual1+yrs exp) in abroad? 2)how the chances wil be if i try to choose DEVELOPMENT side as my carrer using QA experience?
what i s SRS
18 Answers Accenture, BPR, CLG,
Acceptance testing is designed whether or not the software is FIT for the user to use. The concept of FIT is important in both design and testing. There are four components of FIT. State these 4 components?