what is entry and exit criteria?
Answers were Sorted based on User's Feedback
Answer / shilpa reddy
Entry criteria means when we should start testing.this
comes in to existence
1)after preparing complete & correct testcases.
2)after creating testing environment
3)after recieving a stable build from the development team.
Exit criteria means when we can stop testing.This comes in
to existence,
1)after completion of all modules testing
2)after completion of all major bugs resolving
Is This Answer Correct ? | 10 Yes | 0 No |
Answer / ramesh b
Entry Criteria: This defines the minimal requirement to
start the testing activities in the test cycle. For
example, Stable Test environment, Approved Test cases,
Valid Test data , etc.
Exit Criteria: This defines the coditions/ statements which
can conclude the testing. Exapmple, For fixed Bid Projects(
one full cycle of Functional Testing). For other projects (
Testing continued until all high priority defects are fixed
or do not exist.
Is This Answer Correct ? | 8 Yes | 0 No |
Answer / mads
Entry criteria is what has been agreed by relevant parties
as to what needs to be completed before a particular phase
of testing can begin. This can include fully documented
release notes, completion of other test phases etc. Exit
criteria is what needs to be completed before a test phase
can finish. This can mean a certain percentage of test
coverage, or based on there being only X number of critical
bugs. Hope this helps further
Is This Answer Correct ? | 6 Yes | 1 No |
Answer / b.venkat reddy
entry criteria:-
1.when all the testcases are documented
2.when we took the complete prvious document
3.the complete specefications are approved
exit criteria:-
1.all the test cases successfully completed
2.no critical defects found
3.test results are documented
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / arthieviswa
entry exit
unit test to check the modules white box testing
level is done
integration exit of unit test WBT + BBT
test
system test exit of integration 100% BBT
test
UAT exit of system test may be WBT
and compulsary BBT
arthieviswa
Is This Answer Correct ? | 2 Yes | 2 No |
Answer / thilahavathi
Entry criteria
Timely enviornmental setup,starting the web
server and application server,successful implementation of
the latest build.
Reviewing the test basis,(such as
requirements,architectures,design,interfaces)
designing and priotritzing
Identifying necessary test data to support test condition
and test cases.
designing the test enviorment and identifying any required
infrastructure and tools.
Exit criteria,
The purpose of exit criteria is when to stop testing such
as at the end of test level or when a set of test specific
has specific goal.
Throughness measuressuch as coverage of code fuctionality
or risk.
Estimates of defect density or reliabilty measures
cost
bye
thilahavathi
London
residual risks such defects not fixed or lack of test
coverage in certain areas.
schedules such as those based on time to market.
Is This Answer Correct ? | 0 Yes | 0 No |
For Editing functionality: If there are 10 fields on survey form.User can edit anything from theese 10 fields. User can edit only first field or he can edit 3 fields at a time or can edit all 10 fields at a time or can edit 1 field of one survey form, 2nd field of 2nd survey form, 3rd field of 3rd survey form etc. upto 10th fields or nothing will edit & close the form . My question is --> I have to write test cases for above all scenarios? Let me know it's urgent.
How to design the test cases?
i am fresher in manual testing.how to do database testing.
what is Persistent Testing.
what is localization testing?is it a black box testing or white box testing?describe briefly?
what is exemption and resumption criteria in test plan?
what is a data guidelines?
how to face the interview how the dress wear while going to interview
What is STLC?
what is v model
what we do when our reported defect reject?
Big Bang Model isn't preferable for higher cost project? a. True b. False (Need the answer urgently) Thanks!