Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is entry and exit criteria?

Answers were Sorted based on User's Feedback



what is entry and exit criteria?..

Answer / shilpa reddy

Entry criteria means when we should start testing.this
comes in to existence
1)after preparing complete & correct testcases.
2)after creating testing environment
3)after recieving a stable build from the development team.

Exit criteria means when we can stop testing.This comes in
to existence,
1)after completion of all modules testing
2)after completion of all major bugs resolving

Is This Answer Correct ?    10 Yes 0 No

what is entry and exit criteria?..

Answer / ramesh b

Entry Criteria: This defines the minimal requirement to
start the testing activities in the test cycle. For
example, Stable Test environment, Approved Test cases,
Valid Test data , etc.

Exit Criteria: This defines the coditions/ statements which
can conclude the testing. Exapmple, For fixed Bid Projects(
one full cycle of Functional Testing). For other projects (
Testing continued until all high priority defects are fixed
or do not exist.

Is This Answer Correct ?    8 Yes 0 No

what is entry and exit criteria?..

Answer / mads

Entry criteria is what has been agreed by relevant parties
as to what needs to be completed before a particular phase
of testing can begin. This can include fully documented
release notes, completion of other test phases etc. Exit
criteria is what needs to be completed before a test phase
can finish. This can mean a certain percentage of test
coverage, or based on there being only X number of critical
bugs. Hope this helps further

Is This Answer Correct ?    6 Yes 1 No

what is entry and exit criteria?..

Answer / b.venkat reddy

entry criteria:-
1.when all the testcases are documented
2.when we took the complete prvious document
3.the complete specefications are approved

exit criteria:-
1.all the test cases successfully completed
2.no critical defects found
3.test results are documented

Is This Answer Correct ?    1 Yes 0 No

what is entry and exit criteria?..

Answer / arthieviswa

entry exit

unit test to check the modules white box testing
level is done

integration exit of unit test WBT + BBT
test

system test exit of integration 100% BBT
test

UAT exit of system test may be WBT
and compulsary BBT


arthieviswa

Is This Answer Correct ?    2 Yes 2 No

what is entry and exit criteria?..

Answer / thilahavathi

Entry criteria
Timely enviornmental setup,starting the web
server and application server,successful implementation of
the latest build.
Reviewing the test basis,(such as
requirements,architectures,design,interfaces)
designing and priotritzing
Identifying necessary test data to support test condition
and test cases.
designing the test enviorment and identifying any required
infrastructure and tools.
Exit criteria,
The purpose of exit criteria is when to stop testing such
as at the end of test level or when a set of test specific
has specific goal.
Throughness measuressuch as coverage of code fuctionality
or risk.
Estimates of defect density or reliabilty measures
cost
bye
thilahavathi
London
residual risks such defects not fixed or lack of test
coverage in certain areas.
schedules such as those based on time to market.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Manual Testing Interview Questions

What is the diffference between Web-based applications and Client-server applications ??

1 Answers  


Explain spiral model?

3 Answers   AXA,


How u can do regration testing/retesting testing, after assign bug to devloper, how to manage the test cycle number and built number, plz tell me....

6 Answers   Bosch, SAS,


why we choosen testing but not developing

3 Answers  


which environment you like to work?

3 Answers  


what is the difference between test plan doc. and test strategy doc. ?

1 Answers  


What type of testing do we perform in requirement phase?

3 Answers  


What is the concept of introducing a small change to the program and having the effects of that change show up in some test?

3 Answers  


What are the challenges you faced in your project (Testing) and in your company?

0 Answers   Axis Bank,


Hi friends, Intw qs : 1.wat wil a tester do if the developer rejects or doesnt accept the bug u report. thou u try to shw the snap shots wat would b ur next step 2. wat are the quality factors ...explain Cost of quality 3. Wat is root cause analysis : Explain fisher model regds, swati

2 Answers   McAfee,


who preapares use case document? who preapares use functional point document? who preapares use test sceanario document?

1 Answers   Accenture,


How GUI testing will be done in manual testing for a website?

6 Answers  


Categories