what is the process of target load planing?
Answers were Sorted based on User's Feedback
Answer / john
if u have 2 or 3 pipelines in your mapping,which pipeline
will load first?
so taget load plan option will give u the availability of
which pipeline will load first and then which one is second
u can decide based on requirement or your logic.
if u doesn't give tagetload planing option,informatica server
will load the pipelines one by one but how it will take we
don't know.
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / devi
As Per My Knowledge The Taget Load planing Is Most
Important Event While Loading The Target Generraly One
source Qualifier In Our Mapping then we No need to Think
For This I Mean Seriously, When It Has Multipul Source
Qualifiers Then The Problem Is Arraised, Then We
Designated Which Pipeline Is First,Then Which One Is
Next,If We Did Not Specified Proper Method To Informatica
Server Loads Targets But It Doesn't Tells Us
Proper Order So Always We Specified Order To Load The
Target.
| Is This Answer Correct ? | 1 Yes | 1 No |
What is a mapplet/worklet in informatica?
how we can do session partition in informatica any one explain me clearly? thanks advance.
What if i will group by with some port in aggregator and will not pass the sorted values. Will the session fails tell in both cases ( if i have configured it for sorted input and if i have not configured it for sorted input).
Is it possible to create multiple domains on a single Informatica server?
What could be the possible resons of locks by user?
how to load rows into fact table in data warehouse
version controlling in informatica?
What is a filter transformation?
How you prepared reports for OLAP?
One source and 3 targets 1st row-1st target 2nd row-2nd target 3rd row-3rd target 4th row-1ist target how will u do?
How are the sources and targets definitions imported in informatica designer?
What is union transformation?