Which one of the project team members bears the
responsibility of deferring new functionality to a later
release?
Answers were Sorted based on User's Feedback
Answer / vikram
Options were :-
1
The Configuration Manager
2
The Software Test Manager
3
The Engineering Manager
4
The Business Analyst
5
The Product Manager
Ans :- 1 or 4 , not sure
| Is This Answer Correct ? | 13 Yes | 1 No |
Answer / lalit sahu
Its The Product Manager who has the right to decide on deferring new functionality to a later release. He does so based on risk raised by QA team.
| Is This Answer Correct ? | 1 Yes | 0 No |
Is integration testing is a validation testing ?
what is regression testing?
If tester had written test cases for application, then in next build if same features are modified with some changes. Then Should I have to write test cases for the same features to verify new expected results.OR What should I do?
1. when to start and stop testing ?
when developer will found bug they will store that bug in Dts 1- yes 2 - sometimes 3 - No 4 - none of these
Which testing is this- verifying the funtionality of each programme 1. white box testing 2. black box testing 3. glass box testing 4. grey box testing
what are the types of priority and sevority?
What is QCM?
What is User Acceptance testing and when u'll do this and who will do this testing. If u got any bug while doing UAT what would be the status of Severity and Priority?
what is smoke testing?
What are stubs and drivers?
What is the difference between high level design and low level design with example