After conducting an internet search for ways to reduce energy costs, I found a recipe for whitewashing that is said to reflect sunlight. The recipe calls for 20 pounds hydrated lime to 5 gallons water to 1-quart polyvinyl acetate. What is a good source of polyvinyl acetate that I can buy at a local store?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Chemical Engineering Interview Questions

QUANTUM CHEMISTRY AND CHEMICAL ENGINEERING - EXAMPLE 31.4 : In a rigid rotor model in quantum chemistry, the moment of inertia I is given by an Equation E as I = Ma x La x La + Mc x Lc x Lc = m x L x L, where m = (Ma x Mc) / (Ma + Mc) and L = La + Lc, m is the reduced mass, Ma is the mass of a, Mc is the mass of c, La is the radius of a from point O, Lc is the radius of c from point O. Prove by simplest method that Equation E is wrong.

1 Answers  


types and working of compressor

1 Answers   IOCL,


Explain what particle sizes are electrostatic precipitators used to remove?

0 Answers  


why relative humidity is different in different places

3 Answers  


I want previous year question paper of ONGC for chemical engg.

0 Answers  






Are you having any experience in antibody designing?

0 Answers  


What factors go into designing the vapor space of kettle type reboiler?

0 Answers  


Mention some of the specialized crushing methods?

0 Answers  


need the type of technical questions in written test

0 Answers  


Question 110 - When an algebraic product is defined on the space, the Lie bracket is the commutator [x,y] = xy - yx according to Lie algebra in mathematics. If [p,x] f(x) = px f(x) - xp f(x), p = -ih d / dx, find the value of [p,x] in term of i and h.

1 Answers  


Is it possible to compare the resistance to chloride attack of several materials of construction?

2 Answers  


ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.24 : (a) The net present value of an engineering project is given by V. Let Q = summation of [ T / (1 + I) ^ N ] from N = A to N = B, where P = project cost, T = tax inflow, N = duration. If V = P + Q where P = -$1000, T = $275, I = 0.12 (means 12 % , capital cost of project per year), A = 1 year, B = 5 years, calculate the value of V. (b) The present value tax shields are W = $ (11.9725, 9.1486, 6.5579, 4.1811, 2.0005) in 5 beginning balances of an engineering project. Find the adjusted present value of the engineering project X, when X = V + (summation of the values of W).

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)