Have you integrated your automated scripts from Test Director?
Answers were Sorted based on User's Feedback
Answer / preeeety
When you work with WinRunner, you can choose to save your
tests directly to your Test Director database or while
creating a test case in the Test Director we can specify
whether the script in automated or manual. And if it is
automated script then Test Director will build a skeleton
for the script that can be later modified into one which
could be used to test the AUT.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / deepthi
When u work with winrunner u can save ur tests directly to
test director by going to tools-->testdirector connection.
Specify servername,project name,username,password in
testdirector connection dialog box...
Thanks
Deepthi
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ramarao
Firest of all u create the connectin between qtp qnd
testdirector,after that click on lanch button in
testdirector,autmatically qtp window will be open u can
create test script in qtp u have any modifiactions do that,
after that u can close the qtp window u will come tp
testdirector window click on REFERSH button all the script
comes in to the testdirector window. after that it will be
excuted.
Is This Answer Correct ? | 0 Yes | 0 No |
What does Test Grid contains ?
What is test builder?
How to generate the graphs in test director?
which is the latest versions of winrunner ,qtp, test director companies now using in real time?
What is EXPORT AND IMPORT in Quality Center (pl. Explain with easy steps to understand.)
What is quality center( test director)?
Trying to install Test Director 7.5 on my laptop which has windows vista home premium. The error message i am getting is IIS not installed. But IIS 7 is installed and working fine. I also installed IIS 6.0 Metabase Compatibility Layer in "Turn Windows Features on or off" in Vista. But still not successful. Can anyone tell me what is the problem? what version of IIS does test director 7.5 support?
How to fatch data from excel sheet using TEST DIRECTOR
what is connection between test plan tab and test lab tab? how can u access your test cases in test lab tab?
what was the advantage of Quality center? functions performed using Quality center? thanks in advance
Can we have dependency between to bugs in test director? Like : Bug #10 is dependent on Bug #1
What do you mean by Requirment Coverage?