difference between main metering kiosk and check metering kiosk
No Answer is Posted For this Question
Be the First to Post Answer
WHY DISEL GENRATOR SET SHUT DOWN IN OVER LOAD CONDITIONS
1]how the voltages and frequency are achieved on ships. 2]how does the line and phase voltages are related on ships.
what should be the megger test report for 11KV cable when meggered with 5KV megger , what is the resistance value we should get
why return path in terms of neutral is required please give a relevant answer
What happened when a three phase induction motor work on two phase supply.9
Double Busbar Scheme for outdoor switch yard system (132kv) step up power plant Hi friends 1. in this system both busbars energized all the time. 2. what is the meaning of main BB and transfer BB, 3. step up transformer connect main bus bar all the time or both BB connected through DS switch . 4.bus sectionalization means ? thank you.
Selection criteria for Vector group in power / distribution transformer.
A 2083kva AVR was tested, phase to ground shows continuity, what is the implications
why power not passes in plastic and rubber material
How can step up and step down process in power transformer
1 Answers MSETCL Maharashtra State Electricity Transmission Co Ltd,
Which motor runs on both ac and ac? a) dc series motor b) reluctance motor
what is the advantage of pwm pulse compare to squarewave pulse.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)