what is traceability matrix ?what is use of that matix ?
Answers were Sorted based on User's Feedback
Answer / priti roy
It iz document prepared before the test execution process to make sure that every requirement is covered in the form of test case.Every test engineer prepared traceability matrix with respect to their assigned module and send it to lead finally lead consolidates and prepare one tracibility documents
| Is This Answer Correct ? | 6 Yes | 1 No |
Answer / pravati
The relationship between test case and requirements are shown with the help of a document, this document is called as traceability matrix.
1.Using t.matrix we decide the no of test cases are enough for the given module or not.
2.Decide all the requirememnts or functionalities are covered in test cases or not.
3.Review the test case t.matrix is guiding.
4. In real world scenario we will add the test cases against requirement document.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sunita
The relation between test case and requirement is shown with the help of document.This document is shown as traceability.
| Is This Answer Correct ? | 0 Yes | 2 No |
What exactly is quality control? Is it similar to quality assurance?
What should I do if the name of the field is change in new version?How should I maintain it in Test Case Document? Eg: 1)On Login Window:if Login button changed to Ok button 2)the Name of the Login Window get changed 3)Suppose New button adds to Login Window 4)Suppose For Login button there is Alt+L is used in new version Please tell me as early as possible Thanks in advance!!!
Mention critical bugs in hospital management system i.e. project has 4 modules like appoint, patient chart, reports, pharmacy
1. what is severity and priority and who will decide what .?
What is the test data? Differentiate Test bed and Test Environment?What is a Data Guidelines?
How can you report the defect using excel sheet?
Types of risks
how build is send to testing team??
Difference between XP and Vista?
types of reviews?Advantages of reviews? Diff between process and procedure? diff b/w verification and validation? diff b/w cmm,cmmi? exp tqm,gqm,iso,ieee? Roles and responsibilities of tester? Ricks,types of ricks? what r Quality factors?
If developer is not agree with your bug then what is your response?
How we test an ERP products? and wat approach we will fallows and wat r the tools avaliable for ERP testing?