In any project how many mappings they will use(minimum)?
Answer / ratna
it depends upon the project to project. it depends on the number of source tables and files.
| Is This Answer Correct ? | 0 Yes | 0 No |
suppose we are using dynamic lookup cache and in lookup condition the record is succeeded but in target it is failed due to some reasons then what happened in the cache ?
Suppose we do not group by on any ports of the aggregator what will be the output?
Howmany ways yoU can update a relational source defintion and what are they?
Can i create a lookup table without cache.
Does an informatica transformation support only aggregate expressions?
i have thousand records in my source(flat file) i wanna load 990 records i don't want load first 5 records and last 5 records at informatica level?
How to generate sequence numbers without using the sequence generator transformation?
How can a Lookup with Dynamic Cache be replaced in a mapping? Explain.
what is the difference between informatica6.1 and infomatica7.1
Informatica software installation 8.1/7.1.3/7.1 with oracle 10g database (optional Teradata v2R6)
I want skip first 5 rows to load in to target? what will be the logic at session level ??
What is aggregate awareness?