what are the questions that will be asked in interview in civil engineering
Answer / narayan rijal
elective type considering frequently on construction and applied technique
| Is This Answer Correct ? | 1 Yes | 0 No |
10'0" × 10'0" Proposed room Start and Finish How many Cement & Sand & Bricks & Metals & Steels Need
I've beams dimensions of 9"x 18"x 45' please calculate the weight. Thanks
2 Answers SRR Properties, Student, Treetop Solutions,
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
How much shuttering oil required for per m2 shuttering by 12mm ply
for plaster what is the suitable sand.
What is the pet difference between bent up bar and cranked bar ?
1 Answers Foundation Stone, GHH,
How to calculate material and labor required for 100 m2 plaster?
what is the voice of ratio ?
please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)