what is conventional shuttering rate per square feet of
built up area?
what is Mivan shuttering rate per square feet of built up
area?
what is coupler shuttering rate per square feet of built up
area?
No Answer is Posted For this Question
Be the First to Post Answer
Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
Why should appointment store person for project ? what is the benefits for company ?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
who much should be the lap length in reinfocement
What is the origin of name railway sleepers?
How many type thickness vibrator used in concreting,,?
Formula of area of crane hook
though u r a civil engineer, y r u interested in tcs???
0 Answers TCS, URC Construction,
why red bricks used for brickbat coba
qube strenth in 7nth days test
how to calculate the load bearing capacity of slab hos thickness and steel are already given?
Some one plz help me sir ..m gonna start my g 2 rcc building i have a simple design and i want material estimate plz sir help me.someone plz mail to blue print .thnq
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)