A and B can finish a piece of work in 20 days .B and C in
30 days and C and A in 40 days.
In how many days will A alone finish the job?
Answers were Sorted based on User's Feedback
(A+B)'s 1 day's work = 1/20
(B+C)'s 1 day's work = 1/30
(C+A)'s 1 day's work = 1/40
Adding above, 2(A+B+C)=(1/20)+(1/30)+(1/40)
=13/120
A+B+C =13/240
To get A's work,(A+B+C)-(B+C)=(13/240)-(1/30)
=5/240
Therefore A can finishes the work in 240/5 days .ie 48 days
Is This Answer Correct ? | 144 Yes | 7 No |
How to predict the function of a gene (product)?
what is the Reaction intermediate in Reimer-Tiemann?s reaction?
Explain microarray data clustering ?
What is Proteomics?
What is a DNA array?
How many bonds are present in CO2 molecule?
what is Glycomics?
How to compare a DNA sequence to itself by using it for both the 1st and 2nd sequence?
If y=cos-1(cosx + 4sinx)/(17)1/2, then dy/dx is ?
How a cluster algorithm works?
Which of the following is not an essential condition for interference (a) The two interfering waves must be propagated in almost the same direction or the two interfering waves must intersect at a very small angle (b) The waves must have the same time period and wavelength (c) Amplitude of the two waves should be the same (d) The interfering beams of light must originate from the same source.
How do you customize database for blast?