A and B can finish a piece of work in 20 days .B and C in
30 days and C and A in 40 days.
In how many days will A alone finish the job?
Answers were Sorted based on User's Feedback
(A+B)'s 1 day's work = 1/20
(B+C)'s 1 day's work = 1/30
(C+A)'s 1 day's work = 1/40
Adding above, 2(A+B+C)=(1/20)+(1/30)+(1/40)
=13/120
A+B+C =13/240
To get A's work,(A+B+C)-(B+C)=(13/240)-(1/30)
=5/240
Therefore A can finishes the work in 240/5 days .ie 48 days
| Is This Answer Correct ? | 144 Yes | 7 No |
How many grams of NaOH will react with 0.2 equivalent of HCl?
it is a common experience that if we go on burping simultaneously and consciously(i.e.purposely,as in a non- natural action),our stomach starts aching.Why does this happen?
If the present age of my father is 39 yrs and my present age is x yrs, what is x?
How to predict the function of a gene (product)?
Can DeCypher be used for protein struc-ture modeling?
How can i do the Homology Modeling of GPCR receptor successfully? My target identity with template is only 27%
Which of the following parameters is the same for molecules of all gases at a given temperature? (a) Mass (b) Momentum (c) Speed (d) Kinetic energy.
Suppose you used the NCBI Blast server to look for a match to a fruit-fly gene. Suppose further that the best alignment contained this section of an alignment: Hit from database: XXXXXXXXXXXXXXNFSTSQ User sequence: SLEAEAAPASISPSNFSSSQ What do the Xs signify?
How to run DOCK 6 using cygwin?
What is enzyme-ligand interaction?
How the Algorithm works?
when is a Genome project finished?