Technical Question of Civil Engineering
No Answer is Posted For this Question
Be the First to Post Answer
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
Should column area deducted from form work measurement of slab in building?
I found a crack on a slab in my resi.bldg.There must be a leakage.what shall i do for preventing the leakage?
concrete cube strength if fail 1 no in 7 days .What is the solution
What is meant by engineering drawing?
What kind of foundations used in block cotton soils
How to calculate measurement box size for M25 grade cement?
3 Answers Perunding Omega PMC,
Quality control
How to convert aggregate and sand from kgs to ltrs ?
Required Qty of Cement Mortor for 3"x3"x1' groove filling?
How do you compute the volume of airflow?
Beam test is carried out for?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)