what are the testcases for Lift--
Answer / @mit
V Can write loads of Positive and Negative TC's,i m trying
to mention some Imp TC'S:-
1.Verify the functionality of the Start,Stop and Open
buttons of Lift.
2.Check whether the Lift get UP/Down,Open by Pressing
buttons from Outside the Lift.
3.Verify Fan and Light are working or not inside in the
Light.
4.Verify the capacity of the Lift.
5.Check whether Alarm or Camera are working or not inside
of the Lift.
6.Verift that Lift should get stop on appropriate floor as
desired bu User.
7.Check whether the Gate get open or not Automatically.
8.Verify that Lift should get stop in the case of Fire or
Short Circuit.
Is This Answer Correct ? | 17 Yes | 0 No |
How amny times u met ur P.M?(In P.M)
What problem you have right now or in the past? How you solved it?
how clients are using this application?
Which one is not tester responsibilities ? Option 1 Assure the process for contracting software is adequate Option 2 Review the adequacy of the contractors test plan Option 3 Perform acceptance testing on the software Option 4 Assure the ongoing operation and maintenance of the contracted software
What is validation in software testing?
Have you done exploratory or specification-driven testing?
What is d diff. between d window based application and web based application testing?
what is the relation between all tabs in quality center & explain the testing process in quality center with tabs?
How to get the testing experience of capital market or banking domain? Are there any demo applications/websites?
What are the basic concepts of database that a software tester should know?
What is meant by code walkthrough?
a apllication is given to you but the requirements and functionalities are missing what will you do to start the testing?