what is A Datastage?

Answers were Sorted based on User's Feedback



what is A Datastage?..

Answer / bharath

Datastage is an etl tool, enable organizations to extract the information from multiple sources, Transform in the way that make it more valuable and delvers the data into target databases or any applications..

Is This Answer Correct ?    5 Yes 0 No

what is A Datastage?..

Answer / srinivas

Datastage is a Client and server Technology using this we
can design the jobs,run the jobs and monitering the jobs

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More Data Stage Interview Questions

Hi All, Could you please let me know whether Datastage server and px supports oredb? OREDB:It's a Oracle Retail Embedded Database.Previousely It was called as Acumate data base. It's a multidimensional database. Please help me on this issue ASAP. Thanks in advance Ashok

1 Answers   Accenture,


What is use Array size in datastage

0 Answers  


4) source target c1 c1 c2 c3 c2 c4 c4 c5 c3 c6 c7 c4 c5 c6 c7 please send me answer this question my mail

1 Answers  


I WANT TO SEND SYSDATE AS PARAMETER,SO WHAT COMMAND I SHOULD USE TO CALL SYSDATE?

4 Answers   ME,


What is the difference between the local container and shared container?

0 Answers  






How did you reconcile source with target?

2 Answers   HP,


Describe link sort?

0 Answers  


What is the precedence of stage variables,derivations, and constraints?

0 Answers  


hi All, i have one scenario like if source--->transformer-->2 target sequential files the 1 st target sequential file is loads the data from source and 2nd target sequntial file contain the 1st target total record count,and file name of 1 st target seq file and timestamp seperated by delimeter for example if source have 10 record the 1st target seq file hav 10 records and 2nd target seq file example 10|xyz.txt|20101110 00:00:00 could you please help me out how can i implement in datastage job.

4 Answers   IBM,


Hi guys, Please design a job for dis requirement with derivation(solution). my source table like dis. emp_no qualification 1 a 1 c 2 a 3 c 3 b To loaded to target like dis emp_no qualification 1 b 2 b 2 c 3 a my requirement is every employer have three qualifications i.e a,b and c. what qualification missed in source table that will be move to target systems. Hope u got it the requirement. Right Thanks.

0 Answers  


If you want to use the same piece of code in different jobs, how will you achieve it?

0 Answers  


how many write modes are there in ds

2 Answers   IBM,


Categories