which is the cheapest type of temporary flooring(say for
using 6 months on)?
how to calculate sand in CFT from a concrete foundation (m^3)???
cement mortar 1:6 explain the cement and sand coefficient calculation?
How to calculate cement and sand quantities in cement mortar As 1:1,1:2,1:4,1:6 ?
15 Answers Boss Global, JP Group, Kerakoll, NextGen, Simplex,
where lap is provided in colom?
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
what is the relation between seventh day strength & twenty eighth day strength of cement concrete
3 Answers KPSC Karnataka Public Service Corporation,
Advantage of Aluminum form work in terms of activities can be skip and cost too
psc girder detail
what is the weight of wet concrete?
why we create short columns under grade slab?
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
what is density of flyash?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)