What is Workload? Can anyone explain in detail?

Answers were Sorted based on User's Feedback



What is Workload? Can anyone explain in detail?..

Answer / pravash0000@gmail.com

Workload model is the logical set of activities .i would like to characterize workload model 2 types 1.business workload model and infrastructure workload model .
business workload model is totally NFR documents
infrasture workload model is like failover testing

Is This Answer Correct ?    2 Yes 0 No

What is Workload? Can anyone explain in detail?..

Answer / yugandhar.k.c

Load distribution across the identified scenario's of AUT called Workload model.Workload model of an application ensures that how this application is used in production environment
workload model is of two ways
1.Business workload
2.Infrastructure workload
1.Business workload:Set of user actions performed with in the test to achieve the business&Goals.

2.Infrastructure workload:Amount of resource used by the business scenario's to achieve their desired load.
Eg: CPU,Memory

Is This Answer Correct ?    2 Yes 0 No

What is Workload? Can anyone explain in detail?..

Answer / spidy

Work load is nothing but the Vuser load what we are
planning for the test

Is This Answer Correct ?    3 Yes 3 No

What is Workload? Can anyone explain in detail?..

Answer / malya

hI..SEND UR REQUEST TO THIS MAIL ID I WILL SEND DOCCUMENT TO U

MALYADRI.PERFTEST@GMAIL.COM

Is This Answer Correct ?    2 Yes 2 No

What is Workload? Can anyone explain in detail?..

Answer / akash

Workload is nothing but the whole scenario which includes.
1. No of scripts we are planning to run.
2. No of users per script.
3. LGs assigned to each script.
4. Test duration.
5. Ramp up and Ramp down settings.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Load Runner Interview Questions

What is Differed Bug?

3 Answers   IBM,


What is the process for developing a vuser script?

1 Answers  


Explain the Load testing process?

2 Answers  


Where do you set Iteration for Vuser testing?

5 Answers  


What are all the important protocols that load runner supports?

1 Answers  


HI, I have to do Load Test on web application which is having 2 logins. i.e the first login will take to the some links the first one should be one time login due to the limitations. once login need to select one of the link which will take to the main application. i have generated the script using Vuser_Init for first login when i am executing the scripts i am getting error , even i did correlation and did script in HTTP and web Click in either ways my script is not working can you please help me to get this.

2 Answers   CitiGroup, Satyam,


1.How can you Calculate load / stress testing in manually ?

1 Answers   Ness Technologies,


How to call the QTP script in to the load runner? which foment should it be?

1 Answers  


Where are automatic correlation options set?

1 Answers  


What is Perfomance Tuning? where can we use this

5 Answers   AZTEC,


Hi I urgently need a substantial answer for one Q on Vusers - Performance Center. Hope you could help me. Q : My application is intended to undergo soon the load testing with performance center. The Vusers we planned are 100. But the dev team says that we should use 100 different UserID/Password's & each Virtual user should login into a different account while testing. Firstly, is this required ? my application can handle multiple logins for the same userid/password, hence is it mandatory to use 100 different account when we can do the same test with one account. If so, for 1000 Vusers we cannot use 1000 logins right ? I need substantial info to prove my point. Secondly, is this possible to assign a different userid/pwd to each Virtual user ? Thanks in advance & awating your reply Harsha

11 Answers   Polaris, Verizon,


what is the language(Script) use in Loadrunner script?

6 Answers  


Categories