In testing of Cement the formula for water requirement for
setting time is as below-
Water required for setting time = NC x 0.85
The question is that what is the logic of 0.85 in this
formula??


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Physical Chemistry Interview Questions

what are the advantage and disadvantages of evaporation?

1 Answers  


Write the each half cell reaction and also net cell reaction for a cell

0 Answers  


what kind of question can be asked in interview for polarimeter related ?

0 Answers   Ami Organics,


how many types of stability in pharma or API industry ?

2 Answers   Unimarck Pharma,


What is unsaponifiable matters?

1 Answers  






The use of vermilion on rubric of the Tartar Relation is confirmed by the presence of three lines attributed to HgS. Why should this diatomic have more than one vibrational line?

0 Answers  


How much is the molar extinction coefficient of methylene blue at wavelenght 664 nm? Are molar extinction coefficient depend on concentration of solution?

3 Answers   Indfrag Limited,


why silica absorb in mix bed resins in D M plant.

8 Answers   NTPC,


is the pH effects the solubility/micibility of the compound?

4 Answers  


How can be set a responds factor for evaluating a unknown impurity by HPLC

0 Answers   Orchid,


what is enthalpy of hydration?

2 Answers  


Why does the experimental lattice enthalpy of NaI differ greatly from the theoretical lattice enthalpy?

0 Answers  


Categories
  • Organic Chemistry Interview Questions Organic Chemistry (342)
  • Inorganic Chemistry Interview Questions Inorganic Chemistry (123)
  • Analytical Chemistry Interview Questions Analytical Chemistry (1387)
  • Physical Chemistry Interview Questions Physical Chemistry (62)
  • General Chemistry Interview Questions General Chemistry (478)
  • Chemistry AllOther Interview Questions Chemistry AllOther (190)