Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Electrical Engineering Interview Questions
Questions Answers Views Company eMail

What mean 150 amp hour write on battery.

Syncom,

1 2916

_____hamari_____tumhari____ne dil ki_____utari. _____ne ____ dekha ashe ___ doshti ko lage na hamari.Complete pajal

Microfine Industries,

1 4222

how we calculate electricity unit ( meter unit.. for knowing how many charges) from on motor load.?

2 3072

On 400 amp factory load how kvarh capacitors provide

1662

Relation between pyramids and electrical technology?

1 2508

why did the BDV test in transformer?

Jindal Steel and Power,

2 3554

What is SFU why it is used

1 2995

Which motor has high starting torque

Greenko,

2 3977

what is the name of the oil is used in transformer?

5 5761

What is shunt voltage and u v voltage witch one best

SEL,

1676

A 10 MVA, 66KV, 50Hz, Y-connected 3-phase alternator has synchronous reactance of 0.635 Ù. It is working at full load at 0.8 lagging p.f. condition. Find torque angle, neglect armature resistance.

VECL,

2555

With a phasor diagram show the effect of increasing the field current of a generator supplying a constant real power and connected to a grid system.

VECL,

1915

Draw the wave shape of armature current in a generator subjected to a sudden three phase short- circuit at its terminals. Define various reactance of generator from this wave shape.

VECL,

2156

A 400 V, 50 Hz, Δ connected synchronous generator has a field reactance of 0.1 Ω and armature resistance of 0.015 Ω. At full load, the machine supplies 1200 A at 0.8 pf lagging. Under full-load conditions, the friction and windage losses are 40 KW and the core losses are 30 KW. What is the machine’s overall efficiency? Ignore any field circuit losses.

VECL,

1837

A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .

BUET, VECL,

2591


Post New Electrical Engineering Questions

Un-Answered Questions { Electrical Engineering }

advantage of motor design on higher power factor . normally motors are designed for .8 power factor. what is advantage of designing at .88 power factor

1759


how to protect motor in dol starter having capacity of 30 hp.40 hp?

3165


What is difference between Sample test and Routine test in safety standard?

1883


what is the difference between single ratio, multiple core and multiple ratio, multiple core ? please explain.

2157


What will be the voltage regulation of a full load and 0.80 power factor lagging load transformer when a two winding single phase transformer has a voltage regulation of 4.5% at full load and unity power factor?

1179


How do we calculate the Out put voltage of generator, after the excitation is being given?

1894


full form of electrical?

2664


What will be the output voltage of a transformer if it is primarily energized from a square wave voltage source?

1051


what is reactive power?, why its measured in VA ? is it transient behavior of system?

2260


How to calculate the copper in HT motors if KW, RPM & Voltage is given

3164


if an insulated power and control cables of a running gas diesel gensets laid direct in an open trench i.e, trench bed is not rcc of a power house in which rain water, spillage water alwas exists and all power control cables remains submerged even when gas gensets of 480 kw each runningin on load. These power &control cables runs from power house to switchgear room through these trenches in which water remains most of the time. pl explain its merit & de-merit

1832


Why is tan-delta test and capacitor measurement done on alternator?

2167


concept of busbar and load dispatching..?

2379


sir please send me iocl written test paper in my e-mail account. i'll be obliged to you........ thank u roshan

2178


Control wiring of a dol starter for forward and backward

1526