what happens to the water pump if ground water level is slowly decreasing?our water pump is varying from no-load full-load due to this problem
1 1745can a 150 kva 3 phase 440v/230V delta-wye step down transformer can be use as step up transfoermer with connected loads at 440v side?
1 1827Can a 150 kva 3 phase,440v/230v delta-wye connection stepdown transformer can be used in reverse as a step up tranformer ?
3 4704Explain the following and how these are working with PLC Unit 1 I/O Module Card 2 Adaptor Card 3 Ribbon Adaptor 4 I/O bus 5 I/O Devices
1 1706Is it really necessary to have reactive power in transmission line to transfer the power from one place to other?
3 4657Post New Electrical Engineering Questions
please send me previous year questions of jspl through which i could prepare myself for the test.
ANY ONE TELL ME ABOUT generator synchronization panel panel to synchronise 3 gen of 250kva both automatic and manual. 2 gen output vol 415 3ph, 1 gen output vol 400 3ph SEND THE DETAILS DIAGRAM ON THIS EMAIL ADDRESS ayazleo@hotmail.com as soon as possilble best ragrds electrical engineer ayaz mahmood SAUDI TECH
plese send me the oces/dgfs sylabus and previous year question pattern of electrical engg.?
Enlist four components of electrive drives.
can you send me the placement papers of electrical engg. from companis like NTPC,DRDO,IOCL,HPCL,BPCL etc.?If,plz send as soon as possible.Thanks.
I am going to appear RRB Sr. Section Engineer Exam, Electrical. Can you send me previous year questions of RRB Electrical engineer. specially Section Engineer questions. my email id is likerahulworld@gmail.com
Please nybody say, weather the result of Bharat Oman is declared or not? Probable date of declare???????
Hello sir, pls send me hpcl technical test papers .i am. Appearing for the exam.
Draw a block diagramof Three UPS systems connected in Parallel mode?
sir pls send the je exam - 2008 and other model question papers..
can you please send me the technical questions and aptitude questions of honeywell and jindal steel electrical engg. question paper my e-mail ID is(kkesavanraj@gmail.com)
please send me the L&T Emb. sys. placement papers and entire details of pattren
If not into production, how far did you follow the design and why did not you see it into production?
Please send 110 kv sb station full single line drawing(sld)
1)how to reduce the value of tan delta of trasformer and CB,bushing,CT&PT,CVT ? 2)how to reduce the resistance of CB contact and its operating time? 3)plz.....send me the project report on conditioning and monitoring of substation equipment on my email id (gusaiyogendra03@gmail.com)