In pakistan appliances work on 220v at 50hz and in us appliances work on 110v at 60hz what is basic theory to explain it
1 3934As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?
1737Assuming that a dedicated neutral earthing transformer is provided for each GT generator, when the two generators are running in parallel, has consideration been given that the earth fault current from one generator stator winding be split between the two neutral earthing transformers? If so, what adverse impact will this have on the operation of the 59N and 27TN devices?
1621Explain with example of functional requirements of protection relay in terms reliability, selectivity, sensitivity
NCC,
1851Why choke coil is connected in series with starter in tubelight??why starter is connected in parallel to tubelight??
3335Post New Electrical Engineering Questions
What is the name of the winding from which the supply is taken for load connections?
Why we are using only Dyn11 tranformer in distribution system but not using a Dyn1 in distributing system?why not and advantage and disadvantage in both
List out the the types of Mounting Light fixture?
What is power in wattage of 8.5 TR AC
A 50Hz,4-pole,3-phase,star-connected synchronous motor has a synchronous reactance of 12ohmsper phase and negligible armature resistances.the excitation is such as to give an open-circuit voltage of 13.2kilovolt.the motor is connected to 115kilovolt, 50hertz supplying. what maximum load can be the motor torque,line current and power factor?
hi....I am from india..i have completed my engineering in electrical and electronics field with 58.4% and my IELTS score is 5.5 bands....Recently i received my I-20 in computer and information science from Troy university in Alabama.On 18th i have a visa interview can u please tell me what type of questions i have to answer ??????
iam preparing for rrb section engineer post in electrical branch.suggest the right textbook for my reference.fromwhere i will get the previous q.papers?
what is the ms flat constant for calculating earth mat design calculation?
HOW TO CALCULATE HV TEST VOLTAGE FOR ELECTRICAL EQPT.
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating
3 shows a 415 V, 3-phase generator supplying a 3-phase 415/110 V transformer. Draw the individual and combined impedance diagrams to a base of 10 kVA. Determine the system fault kVA and the fault currents at the 415 V and 110 V busbars for short circuit faults on the transformer input or output terminals. Work in p.u. values of impedances.
how to calculate the change over time for star delta starter for different KW motor?
What will be result if we connect LT votage to the terminal of HT motor?
How to calculate of maximum demand if given 628kw, 785kva, 0.8 p.f.
10 tube light connect in mcb breaker.one tube light is fault.so breaker is tribe.how fault is rectified.(using 3wire phase,earth,neutral)