How much width of the land shall have to be left below the EHT line of 440 kv as per the rule. i am told that a corridor of 35 M width is to be left free below 220 kv line. please confirm
1 3427if we have a industrial load of 400 kilowatts with 415 volt AC then how much total harmonic distortion (thd%) should be acceptable for steady power system.
2031Dear Sir / Madam, Actually we requied 64 A MCB, But i have 32 A MCB = 2 No's this two i have to make series connection and we usw any place? isit possible or not......
4 7749if we install two earth pits with a clear space of 5m without any interconnection,by checking the digital multimeter will it show continuity between earth pits? If so what would be the approx. value
1991when generator short circuit condition, the current how dissipates. or at short circuit voltage not available then current how can flow?
2239Post New Electrical Engineering Questions
what is the transmission loss for electrical supply? specifically a large shopping complex where the grid is half KM away, what will the % of transmission loss? is there any transmission loss for captive unit generation for above set? thanks
What is power in wattage of 8.5 TR AC
whether starting current is limited to rated current of motor through soft starting or it exceeds the rated current?
List advantges of active filter over passive filter?
Draw the single line diagram of the power station?
Can we use BS 6651 and BS EN 62305 standards for computer room lightning ptotection in substation?
hi if anybody got model questions for cpcl Grade'A' electrical engineer position.send it to my mail please krishkumar22@gmail.com
What is VCB? where it is installed at SP. What is SP?
how to synchronize 3 phase slip ring induction motors of different ratings.
hi frds, i m electrical engineer.can i get cdr for electrical engineer if u have then send me on my mail id its jayesh_ee88@yahoo.com.please help me frds
Sir, I have applied for the of Jr.engineer(Electrical & Electronics) & ASST. LOCO PILOT at ALL RRB BOARDS. please send me all RRB Boards solved papers in the year of 2001 tO till date. i requested send me the papers to my id as soon as possible (jet_0991@yahoo.com). (This is very urgent) Thank You,
i want to model paper for section engg.
From what on-site components does the HT panel monitoring the bus-bars in a 11kV system take inputs?
what is the correct format to create a resume for interview??
difine electrical ballast in HPSVL