do anyone out there know where to find a compleete list on acronyms/abbreviations used in offshore electric engineering. MCB - Micro Circuit Breaker, MCCB-Mouldes Case Circuit Breaker, ELCB-Earth Lekage Circuit Breaker, ELMCB- etc.....
1 2146what is meant by the phrase 'static load' in case of shorting in a generator excitation system?
1 2212can any one help me out by posting something related to rvnl interview for site engineer electrical.? what is the procedure? what kinda question they ask us? how long the interview goes? and any tips? and any thing you want to share?
2331can any one help me out by posting something related to rvnl interview for site engineer electrical.? what is the procedure? what kinda question they ask us? how long the interview goes? and any tips? and any thing you want to share?
RVNL,
1 11924What is Partial Discharge test .Please specify that this test can be test on 11/0.433 KV,630 KVA Transformer.
NBCC,
1 3290Why cannot we insulate HT over head cable to avoid ionization of air around the HT Cable?..By this we can minimise corona loss also..
1 3660I have 200 KVA Isolation Transformer for UPS input side. & ups was having 48% load, suddenly got short what will be the reason.
1 3093Post New Electrical Engineering Questions
please send me the L&T Emb. sys. placement papers and entire details of pattren
send me any model test paper of clerical post of state bank of india.......
xfhnchncv?
hi this is hema can anyone mail me previous years questions for the APPSC-A.E.E (in electrical stream.) ......thank u.
PLZ sent the previous year question paper for GET in NHPC on my EMail id ppshanker@gmail.com
Enlist four components of electrive drives.
i want bhel placement paper for electrical if anybody having pl send to my id kavitha867@myway.com immediately
Draw the vector diagram and condition for the following: 1) Dyn1 2) Ynd0 3) YnYn0
How to calculate VCB rating for 33KV ,25 MW Power line?
hi frenz,its aswathy.i hve aplied for the hpcl test on feb,pls send the test patern & the placement papers as soon as possible. mail-id :kjaswathy@gmail.com
hi plz send me reliance placement papers..i.e electrical technical papers that have been asked in reliance test.
I have 2500KVA transformer delta/star,13.8KV/380V provided with LV 4000A breaker. Already I have 2300KW motor feeder with a full load 90%. Is it possible to connect another 1600A from that breaker? If so how the calculation is done?
What will be result if we connect LT votage to the terminal of HT motor?
could anybody able 2 send me jindal steels previous papers fr electrical steam....pls send 2 my id if possible....sirisha.shaik@gmail.com
Draw the vector diagramme for Asynchronous Induction Generator at noload,half load and fullload.