Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Electrical Engineering Interview Questions
Questions Answers Views Company eMail

234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,

Jomel,

1 2114

current and voltage equations for a star connected load fed from a delta connected load.

1 4226

what is the maximim current drawn by 1 phase and three phase welding machine

1 1933

what is power factor for any engineering equipment?? what should be its value?

ETA,

3 6205

how to calculate capacitor rating for an induction transformer ex.for 12 mva furnace calculate capacitor rating

2 5782

How we can make sure cable size of LT cable without any parameter.

Paradip Port, Siemens,

2 7146

what is the meaning of knee point in current transformer and how to calculate?

2 7377

234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,

Jubail O&M,

1 2310

63MVA,220KV/6.9KV Transformer LV side neutral is connected to Earth pit through NGR. Whether this earth pit required to connect with near by below grouding earth mat or it is to be kept separate?

GSECL, L&T,

1 2812

i have installed my solar site of 6.7kw and is working perfectly , can somebody tell me that how can i measure my solar irradiation kw/day/sq m ?

3 5011

our scope called one core cable for distribution system so we like to use 4 core cable with one equipment grounding conductor so what kind of technical reasons i can say that the 4core is better then 1 core,

Elite Construction,

2 4326

how to calculate busbar size? if ex:1000amps i need to calculate busbar size and what size of bar?if any example caculation pls give the formulas.

2 5948

what are the components of a start and stop motor control?

2 4293

In my project i am layout cables under the Maintainance bay /Maintainance yard in the TG Building. Whether in this route i can lay the H.T.Cables??? i am taking all H.T cables from the H.T Transformer to the TG Building..

1 3286

why we use ac system in india why not dc

3 9617


Post New Electrical Engineering Questions

Un-Answered Questions { Electrical Engineering }

Why neutral point is consider as zero potential?

2733


pls someone send me sample question papers along with the key.thanks in advance

2462


Enlist four components of electrive drives.

1900


TO CALCULATE THE RESISTANCE OF GRR OF HT MOTOR 400KW WHEREAS STATOR VOLTAGE 6.6KV AND ROTOR VOLTAGE 705V AND ROTOR CURRENT IS 346A.

5596


what is mean by restructuring power system?

2140


hi friends i m from electrical branch and seeking for tech. + apti. both papers of hpcl plz get it available as soon as possible

1898


why and how voltage sharing in transformer, during magnetic balance test ?

2431


Draw the line diagram of diffretial relay connected to transformer?

2514


sir please send me previous year questions of jspl of electrical section through which i could prepare myself fpr the test.

1983


Dear All we are having a problem in G120 BOP showing alarm A0503, F0052, F0060 we can not remove fault alarm ,Please any body help us. kowsar

1951


I am shobana from Chennai. I am having my personal interview on 19th Dec at Chennai.kindly mail me the questions to mail id shobana.shanthi@gmail.com

2452


Q.1:What protection will be used on HT and LT side of 33/0.4 KV, MVA transformer. Indicate capacities of protective device to be used. Q.2:Which types of back-up protections are used in the power transformers? What do you understand by the term over travel in the relay? Q.3:How star and delta connected winding transformer are provided from earth fault

2195


Draw the vector diagramme for Asynchronous Induction Generator at noload,half load and fullload.

2078


I have 2500KVA transformer delta/star,13.8KV/380V provided with LV 4000A breaker. Already I have 2300KW motor feeder with a full load 90%. Is it possible to connect another 1600A from that breaker? If so how the calculation is done?

3876


what is the minimum pay scale for electrical engineer (building construction)in kuwait? plz revert back with yrs of experience & pay scale respectively.