At 765Kv, I have seen the use of PT at line side for metering and CVT for protection, although as far as my knowledge is concern, PT at this voltage level will have huge loss and more cost as compared to CVT as CVT can also perform same function of Protection and Metering? So my question is why use PT and not CVT for metering and protection in order to reduce the cost.
1 3682why transmition and distribution and genaration of voltage in multible of 11 means 220v,440v,11kv,22kv,,,...so on
3 5119how to create new innovation what are the supporting sources in the electrical field for Electrical engineers.....?
1 35181) why a dg set shows variation of power factor and load when synchronised with other dgs? 2)Why the load sharing is not become equal in all dgs?. 3)When a dg set will not run on auto start?
2003we have taken HV test of 2.5 k and Megger test on 11 kv HT cable.here it shows no fault but when we are charging the same cable with 11 kv supply why the VCB 11 kv gets tripped can anybody define the possible cause of fault ?
4 6734Why do we need ring main unit (RMU). what is its purpose and its advantages . what is the operating function of rmu
6 39541In VVVF drive voltage is varying in accordance with frequency.My question here is How much will be the voltage in the inverter side if the frquency is set for 10Hz ?
1 3827what are the Alarm, Trip & Safety equipment (Issues) present in Power Transformers pls Mail it to ashokbabunhce@gmail.com
1915please give me all the Alarm .Trip ,Safety Relays & Conditions of UPS Systems mail me on ashokbabunhce@gmail.com
1790please give me all the Alarm .Trip ,Safety Relays & Conditions of Chiller mail me on ashokbabunhce@gmail.com
1828Post New Electrical Engineering Questions
Is it possible to download the Siemens Selection Chart(TYPE 2 coordination) for 1) fuseless selection 2)Fuse selection
how the works electronic energy meter?
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram
why r we using shell transformer for low voltage
If we have to find the inductance of a dc shunt motor then by giving dc supply or ac supply and what is the reason for it. (this example is from "to determine the transfer function of a dc shunt motor ")
whati s the sludge current in ups
how to select automotive wire by mathematical equation with given current, vlotage and resistance
How can we calculate ac current from the given DC current when AC voltage is given?
11 kV line deraction check by an Engineer.
What is the importance of earthing?
sail kaott diploma ece ke interviw me qus.kis parkar ke aate hai aur G.S me kya puchate hai kya sameedyaan me kis parkar ke qu.puchate hai
Atwhat condition reverse power relay will act?
Terminal blocks is used for segregate the connections... There is any principle for terminal block..?
Consider three heater bank connected in 3 phase star with neutral.Each heater bank connected in each phase.So each phase get 230 volts supply.my question is,during balance condition, current flow in neutral or Not
what are the main applications of transistor in non-linear region?