Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Electrical Engineering Interview Questions
Questions Answers Views Company eMail

How to set an overload in a motor?

3 6177

What will happen if the generator turns in a wrong direction?

2 5662

What does a permanent magnet generator do?

1 3706

What is excitation?

2 4803

What is the formulae of Megger value for a A.C.Motor

2895

in three pin plug 6 Amp. 220v AC rating. why earth pin diameter is higher than ohter two pin? what its purpose ?

6 9140

when we connect the capacitor bank in series

2 6843

Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

HAL,

2028

We have 90mX100m hangar with 16 no.of supporting pillar. It is required to provide power supply on all pillars. what is suggested earthing scheme for hangars.

HAL,

1996

What the formula for calculating no.of earthings & size of earth strip for 100mX90m shop.

2364

How to design grid earthing

1 4633

resistivity of copper

1 3355

In a company the lines carrying 33KV but the load is below 10000Volts so we know that <11KV we can put 11KV lines but the lines are 33KV,..so how we can step down the voltage to 11KV with out erecting a substation

1 3033

What is Icu and Ics and what is difference b/w them. please tell me how to calculate a size of a copper bar for a system or a breaker... reply on... king.arish@gmail.com would be waiting for a logical answer.

2458

What is the basic principle of circuit breaker?.. I read that it works on electro-mechanical principle... Does it require both electric n magnetic conversion to act?

3 6419


Post New Electrical Engineering Questions

Un-Answered Questions { Electrical Engineering }

We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.

1957


What is the function of electron gun used in crt?

1062


How to calculate Temp from Resister from PT100 equation,

1759


What is the Minimum winding resistance of motors ( small & big)? referance range

2308


why is control bus bi-directional?

2166


what happen if drive input fail momentry at 48.5 HZ frequency?

1926


difine electrical ballast in HPSVL

2091


What is a difference between indoor transformer and outdoor transformer of same rating

5823


HOW TO SELECT THE COPPER CABLE SIZES OF MOTORS,TRANSFORMERS?

2118


my UPS suddenly goes off and all panel light also blow off.This happens even main electric supply is not interrupted.After some time it automatically starts functioning normally.Batteries are new.

2064


Explain marx circuit.

1334


can i use 2000/5A Clamp meter to measure HT cable

2025


State nyquist stability criterion.

1175


what is the difference between gas group b and gas group c electrical equipment construction wise?

1868


what is the physical connection of a analog i/p to a analog i/p module (ab plc)and through a analog o/p module(ab plc) to a analog o/p . and how all the process control by scada