in 132 kv substation ligtning arrestor(120 kv) connected to line. but line voltage comes to 132 kv, it operate or not???
4 16632voltage of a ckt is measured by volt meter having an input impedence camparable with the out put impedance of the ckt Eror caused is 1. Gross Error 2. Errors due to lloading effect
GATE,
2 4167when the control mechanism is present for an ammeter(1-10A) and 1A current is apllied what will be the reading of the meter?
GATE,
2 4501Relay setting for earth fault of reciprocating and centrifugal compressor motor feeder.Setting will be different or same?
1 3986The error in a single phase energy meter where pressure coil lags behind applied voltage by 88 degrees and pf is 1) upf 2).5lag
GATE,
1 4607Post New Electrical Engineering Questions
WHY IN AC DRIVES,INPUT PHASE CURRENT SHOW UNBALANCE?
In 11/0.414 KV Parralel supply network with Bus tie closed what will be the fault level is it doubled or halved??
write down the formula of cable size in RM if current is 50Amp.
Please explain, how to test vector group of tranformer(Delta y1) . Thank
What kinds of decision are made about CT from it's Knee point(voltage & current)?
How many sprinklers should be in one pipe line?
how to determine motor size for a fan application?
What is the difference between alternator and generator?
It is desired to flood light the front of a building 42 meters wide and 16 meters hig.Projectors of 30 degree beam spread and 1000 watt lamps giving 20 lumen/watt are availabl.If the desired level of illumination is 75 lumen/m and show a suitable scheme.Assume the cofficient of utilization, deprecitation factor and waste light factor are 0.4, 13 and 1.2 respectively.
how can i change the rotation of the AC single phase induction motor and show me by diagram
what is relation between ct and pt ratio with multiplication factor of a energy meter? is there any other factor on which multification factor depend?
Meaning of ingrace protection for motor.for ex IPXY
How could a garment factory benefit from renewable energy
why we use single core 630mm2 cable for transformer secondary side
What is the unit audit? if our Max demand is something and we found much more unit then how to improve our max demand?