hi this is swaroop i appliled for masters in us for mba and my ielts score is 5.5 and no gre and i have 14 backlogs
1 1714When can we using journal bearing and what is differences in duty between it and friction less bearing ?
NOC,
2 3939what is the reason? if centrifugal pump is not discharge the water or not suck the water in running condition.
6 6789How to decide the capacity of air compressor in an industry. What are the factors taken into consideration while selecting the capacity?.
DAE,
1 3015Some case studies on predictive maintenance of an Induction motor, pump, air compressor etc.
DAE, HAL, JSW Steel, Turbo Energy,
1 3386Post New Mechanical Engineering Questions
hi fiends i am a diploma engineer(mech).now i am preparing for b.e mech part time course. could be send me entrance questions paper fo me .'sureshscad@rediffmail.com'
sir most regardly i want previous papers of your company for my preparation of my written exam
Sir, I'm P.Ravi Kumar want to previous mechanical Question Papers for rrb exam
If anybody have the ref. design book of the 3 point cylindrical rolling with sheet thickness of 2.3 mm & 67 mm internal diameter legth of 80 mm
any body hv a experience of L&T pget interview for mechanical thn send me question and experience to me as i hv interview on 8 th may so send me as soon as posssible on my mail id nilesh.spy2000@gmail.com
How to convert GSS duct volume in KG for all guages
pls send me HPCL model question paper for the post of officer trainee for mechanical engg. tnk u....
i have want jindalsteel tecnical wrritten test paper.
any one have amw(ASIAN MOTOR WORKS) QUESTION PAPERS OF PREVIOUS PLS SEND ME AT mahendra_yalavarthi@yahoo.com
Hai, i am going to appear for Section Engineer- Mechanical,RRB Chennai.Can anybody please post me the previous question papers and solutions to ajeshsudhakaran@gmail.com....
Study the attached ACS 790 AHU and boiler GUI and refer to the video on the software usage, catalog and the step by step document (page 9) to perform the following task: List in a table form the controllers and all their connected I/O for the boiler and the AHU.
plz sent me jindal placement papers in mechanical enginnering
CAN SOMEONE GIVE ME THE LINE DIAGRAM OF A VAPOUR ABSORPTION SYSTEM (VAM)(AIRCONDITIONING)AND A 600 TON CENTRICUGAL AIRCONDITIONING PLANT.
send interview questins about pro_e to me mohanrvs_1984@yahoo.co.in
please sent last five years junior engineer mechnical question pappers