Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
What is critical pressure ?. What will happen if water is heated above critical pressure and temperature?. What importance it is having related to Boiler?. Upto what presrure natural circulation is possible in Boilers?.
in tpp how steam pr. decreases from steam drum to main steam line
Name the device which converts sound energy into mechanical energy?
What is base design drawings?
effect of temperature on stainless steel at temp(500C-750C) in respect of the following properties-required for silencer application 1.thermal conductivity 2.heat conduction 3.mechanical strength 4.temperature to weight ratio with values
What is the spinning jenny?
If we heat the rod what will happen,draw stress & strain curve before after heating ?
What is the difference between Michell type bearing and anti friction bearing and the application.
how control valve works? process line pressure is 50kg/cm2g and instrument air pressure is about 4 kg/cm2g.
rrb junior engg mecf questine papers
Why the ship cranes are not having counter weights irrespect of industrial & civil construction cranes are having counter weights.
How much is the work done in isochoric process ?
What are the symptoms of broke piston ring?
Function of nozzle holden