how much quantity of blocks, cement and sand is required to complete 1sq.m of CC Hollow blockwork. Size-16"x8"x8". Also what is the cement sand ration commonly used?
ACC, CCCL, L&T, MFAR, Shoba Devlopers, SLS Developers,
10 2375671)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
AVS,
1 5343Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
2096what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
2385difference between ordinary portland cement concrete strength and pozzolona portland cement concrete strenth
NCC,
5 21447Post New Civil Engineering Questions
Can we apply curing compound on ceiling (slab Bottom)
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
cause of cylinder test failure
Civil engineering material testing Standard results
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
PL.tell me about civil engineering questions with answer
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
What is Critical path in Ms-Project ?
Please design 12.5m long dubbly beam
What out turn civil works
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
What is an ortho mode?
What is the likely strength of a 1:2:4 concrete mix?
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?