how much quantity of blocks, cement and sand is required to complete 1sq.m of CC Hollow blockwork. Size-16"x8"x8". Also what is the cement sand ration commonly used?
ACC, CCCL, L&T, MFAR, Shoba Devlopers, SLS Developers,
10 2314891)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
AVS,
2251Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
1638what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
1948difference between ordinary portland cement concrete strength and pozzolona portland cement concrete strenth
NCC,
5 19664Post New Civil Engineering Questions
length where bent up is made in slab of bridge from one end
How to fix toll charge for a particular vehicle at toll booths in a highway?
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
why does the most of civil engg is not intersted to going for teaching field?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
Whats the meanig of ,'K' VALUE in the case of soil.....
what is the anchorage length of reinforcement.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
difference between trapezoidal and pedestal footing and how the load acts on that
How high should the water tank be to provide a 60 psi at base of this water tower?
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
How do you measure water flowing through 300mm diameter pipes?
what is cross hair cursor?
how can we calculate steel value, depending on load
Which purpose we use deck anchor in bridges?