Civil Engineering Interview Questions
Questions Answers Views Company eMail

I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

980

How to evaluate the elastic modulus of soil from the plate load test result? for example ..one of test results are here Max. settement =4.56mm(at 900kPa) Residual settlement = 4.02mm Maximum pressure on soil 900kpa Soil bearing capacity 300kpa Plate diameter=300mm Thickness =25mm Soil description =Grey, clayey silty SAND with gravels and rock fragments

1 7241

rate analysis hiring of generator 62.5 KVA

796




how much quantity of tile placing can be finished by one mason per day?

Ericsson, Gulf,

4 14344

how to calculate the dome surface area

2 6917

why crakes are developped in opening corners

3 4587

how much binding wire is reqd for 1 MT

IVRCL,

8 10486

how many no of light weight solid blocks of size 600x200x200mm required for 1cum of block work

4 5038




WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.

L&T,

804

What is Lean Concrete?

L&T,

12 45204

actually dia of the bar reduce asper drawing spacing also decrease that time so how to calculate the spacing of with respect to changed bar dia?

L&T,

766

actually dia of the bar reduce asper drawing spacing also decrease that time so how to calculate the spacing of with respect to changed bar dia?

L&T, Kamala Group,

4 6457

Lapping Work Explain Briefly

2 4588

If in a structure, e.g, 20mm steel bar is not available and we use 16mm steel bar instead of 20mm bar, how can we calculate the no. of steel bars for 16mm diameter bar?

5 19727

How much percentage of brick bats allowed in CD-75 bricks

914


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used

3023


resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil

914


Prepare a Schedule for a Highrised building from starting stage to Handover?

506


Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?

470


can i get hindi version of is codes based on civil engineering?

3034






what is the mode of method of face bar measurement

1214


Why provides hook of stirrups only ones side?

739


What is costing in 100squre feet bricks

650


How to calculate steel for beam slab and column

573


16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.

16590


a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.

962


How do You Maintain a structure after getting cube test of low strength.

1063


How to do bbs in excel format

509


how to calculate mivan shuttering matrial

58


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

1369