1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work and cc block work and plastering how many m2 per day 2) one carpenter per day how many m2 will do as well as scaffolding how many m3
Al-Futtaim, Arihant, GS, Gulf, L&T, NCC, Paras Buildtech, PR Constructions, Ramco,
12 156165Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
L&T,
2055Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
L&T,
1534what are the natural dynamic pressures on a structure in coastal region like chennai, vizag etc,
1 2870WHICH KIND OF ADDITIONAL PILE DRIVEN TO INCREASE THE CAPACITY OF SUPPORTING LOADS ON VERTICAL PILES
3 4519we have a texmo make submersible water pump 5hp 10 stage what will be the total head & is it any thumb rule for calculating the head please reply urgently
3 10845we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
1420Post New Civil Engineering Questions
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
How to do bbs in excel format
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
For what purpose bedding is used under storm water drains, explain?
what is diffrence between catchment area,watershed and basin?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
why are you joining in this (applied post) job and your aim for this job
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
how much to get of BRC lapping in full yield and half yield ?
pls tell me , what is the water content
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
What is modular elasticity?
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
how to do sudoko puzaals?
What are the applications of cad?