Civil Engineering Interview Questions
Questions Answers Views Company eMail

is there any information regarding MPSC2010

1 1964

Whr should a joint be located in a beam if the provision of a joint is unavoidable??

BMTC,

2 3652

1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work and cc block work and plastering how many m2 per day 2) one carpenter per day how many m2 will do as well as scaffolding how many m3

Arihant, Gulf, NCC, Ramco, L&T, Al-Futtaim, Paras Buildtech, GS, PR Constructions,

10 117326




how to find the diameter of steel bar from steel area

3 23288

Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.

L&T,

1663

How foundation is designed, Column design and beam design

L&T, College School Exams Tests,

996

Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?

L&T,

951

what are the natural dynamic pressures on a structure in coastal region like chennai, vizag etc,

1 2396




explain about earth quake zones? Chennai falls under which zone

1 4214

what is lap length? why it is required?

4 8308

i have a bar of 20 and 16, lap length is 48*dia of bar, what is the lap length here

8 8790

i have a bar of 36 dia in column, what is the lap length?

RMC,

12 12906

WHICH KIND OF ADDITIONAL PILE DRIVEN TO INCREASE THE CAPACITY OF SUPPORTING LOADS ON VERTICAL PILES

3 3269

we have a texmo make submersible water pump 5hp 10 stage what will be the total head & is it any thumb rule for calculating the head please reply urgently

3 9862

we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level

1059


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

What goals do you have in your career?

845


Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?

1477


Process of pcc in wateredug

914


Design a rectangular channel.

1618


sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].

862






What do you mean by bond? What are the different types of bonds?

837


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?

1009


why we can use dust in concrete insted of fly ash

750


difference between fc and fc'?

488


What is meaning of FREE STANDING STAIRCASE ?

1562


please briefly explain calculating or estimating steel quantity for a RCC column?

605


how much need sand and cement for 1 cft roof construction?

3146


Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand

165


What is the cemnent ratio

996


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

1370