calculate the cost for AAC block wall of 15cum?

2 1967

How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM

649

Please let me know the simplest way of Calculating mix designs for any grade.

Bureau Veritas,

1 1930




20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u

Dhruv Construction,

695

how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm

MFAR,

768

What is Dewatering ?

GreenTree,

1 1833

how to calculate for ramp slop?

3 1601

m30 mix proportion as per IS code

4 1815




Why silt content not allowed more than 6% for Sand ?

L&T, NTPC, CCEL,

2 2814

How much Pressure will apply in Water proofing Grouting method to fill the crack in beams or slabs?

GMC,

2 1331

What is different between DI Pipe and CI pipe?

DAE,

624

what is the ingredient value of 40mm and 20mm aggregates?

Power Grid, Nexus Technologies,

762

what is the voice of ratio ?

Power Grid, PMG,

1 1861

A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S

Vyom India,

524

Wats the formula of eccentric footing and how was calculated from concrete qty

1040


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site

279


CAN WORK WELL UNDER DEAD LINES OR PRESSURE?

765


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

655


I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item

502


In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:

2187






What is chemical composion test

679


calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick

572


What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?

1175


what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing

941


How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir

190


why the openings of sieves are square io size?

235


how we calculate the vol.of wet concrete..?

537


How many % we consider for lap for reinforcement for estimates

564


What are your future hopes for this job?

832


What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?

795