Civil Engineering Interview Questions
Questions Answers Views Company eMail

please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches

1301

how many type of admixtures for water stored structure?

IVRCL,

1042

what is the maximum height of concrete casting.

IVRCL,

2 6288




which type of foundation are most prefarable in blockcotton soils

IVRCL,

3 4214

how many minimum admixtures are used in water froofing structures

IVRCL, Rooftek,

1009

what is the main disadvantage of concrete at environmental point of view.

IVRCL,

3 4386

how much tempareture are required to make liquid state of pid leed

IVRCL,

1012

what type of cement are used for fixing of tiles at floor/wall

IVRCL,

4 5939




what is the MSL?where is it located?

IVRCL, C-Tech RC Design, Era Infra Engineering,

2 5310

how many bricks are consumed for 01 Cum of brick work

IVRCL, Fusion,

10 7237

what is the life span of water proffing plywood for concreteshuttering work

IVRCL, Fusion,

3 3765

how many types of admixters are used for C.C. Road works

IVRCL, CADS Software, PSK,

1 3761

what is the minimum depth of cover required for pipes?

IVRCL,

2 4823

density of flyash

4 4284

What is the permissible limit of silt contain in sand for rcc Work?

Ambuja,

7 5440


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

What applicable rate of wct in bihar

631


what is a well

811


what is the difference between np2 and np3 concrete mix

787


I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

1042


what is the ingredient value of 40mm and 20mm aggregates?

798






Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?

4350


how is the reinforcement is distributed in triangular slab

939


how much cement and sand required for 1cum rr masonry

3491


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

559


psc girder detail

1480


how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.

1097


Rate analysis of Vitrified tile in cement mortor 1:3

2172


I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.

1052


quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data

2000


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

812